The company “Plant KDM” opened a new assembly line for garbage trucks with an area of more than 1,400 square meters. m. This will allow the Smolensk plant to increase the annual production of garbage trucks (from 200 to 500 units), increase its market share and reduce the delivery time of equipment to customers.
The model line of KDM Plant LLC today includes more than 40 modifications of garbage trucks, which are produced on any basic chassis. In 2025, the company produced 200 such machines, and the company’s share was 9%.
Investments in production expansion amounted to 140 million rubles. The funds were used for the construction of a new building with an area of more than 1,400 square meters. m, preparation of premises and purchase of equipment.
The assembly of all models of SM rear-loading garbage trucks will be completely transferred to the new workshop. As the company’s press service emphasizes, 40 to 50 units of equipment will be assembled here every month.
GAZ modernized Valdai trucks JAC redesigned the N200 model at the request of Russian retailers Rare diesel Zhigulis went on sale
A new generation electric garbage truck was tested in Irkutsk. The RT-NEO IRKUTSK company has completed two-week testing of a prototype of a new electric garbage truck developed by KAMAZ PJSC.
The first American electric vehicle, Jeep, is experiencing a decline in demand, as was clearly…
The Subaru Ascent has been in production for almost ten years, and after the 2023…
Ford and Chevrolet have been competing for the title of fastest American brand on the…
At the broadcast of Formula 1 in Miami (Sky Sports F1), the attention of those…
Volkswagen has officially unveiled an updated electric car – the ID.3 Neo hatchback, which replaced…
A few years ago, BYD's YangWang took the internet by storm when it showed off…